Tuas Water Reclamation Plant

Project Name

Tuas Water Reclamation Plant

Project Type

Construction Site

Client Name

Public Utility Board, Maincon, McConnel Dowell

Location

Singapore

Start Year

2019

Year of Completion

2023

Maintenance Duration

Dec 2026

Services

Design and Build, Access Control System (ACS), Wireless Fidelity (WiFi), Individual Voluntary Arrangement (IVA), VwatchPro

Project Photos

SINGAPORE PROJECT REFERENCES

Tuas Water Reclamation Plant

The Advanced TWRP will receive used water flows from the western part of Singapore by gravity via two separate deep tunnels – a tunnel to convey domestic (municipal) used water and another to convey high-strength industrial used water. These two sources of used water will be treated separately. The Tuas facility is a key part of the US XX billion project designed to meet Singapore’s water collection, treatment, reclamation and disposal needs, by extending the existing deep tunnel system to carry wastewater from western and southern areas to central water reclamation plants.

Fully Integrated VwatchPro AI Smart Digital Site Access Management Portal Solutions:

  • License Plate Recognition and Wired & Wireless Face Recognition for Plant Exit & Entry
  • Whitelist & Blacklist Human Detection and Strangers Recognition & Detections
  • AI Panoramic Cameras complete with Outdoor Wireless Solutions
  • Network Security Solutions, Digital Site Access Management Portal (DSAMP)

AI Facial Recognition Solution

Actual Site Installation at TUAS Avenue 10 Construction Site

Pixelab Facial Recognition Panel Integrate and Barrier Gate with VwatchPro

Pixelab Facial Recognition Panel Integrate and Automatic Outdoor Turnstile with VwatchPro